(9) 6" Schedule 40 PVC Pipe End Caps — photo 1

(9) 6" Schedule 40 PVC Pipe End Caps

GSAMilitary📍 OLDTOWN, ID

Current Bid

No bids

Time Left

4d 9h

Ends Apr 7, 2026

Seller

🏛️ Department of the Army — Department of the Army

Condition: As-is

Description

Overview This lot contains a set of six-inch Schedule 40 PVC pipe end caps. The lot includes 9 end caps that are new in box. The items are classified in used condition. Key Features Schedule 40 PVC construction with six-inch diameter sizing. End cap design for pipe termination applications. Items are packaged in original manufacturer boxes. Condition & Markings This lot is in used condition. Parts may be missing, and repairs may be required. The end caps are new and unused in the original packaging. Inspection and Removal Inspection and Removal: Available Monday through Thursday, by confirmed appointment only. The site is closed on federal holidays. Contact the property custodian (listed below) to schedule an appointment. Property Inspection: Bidders are strongly encouraged to inspect the property prior to placing a bid to evaluate its condition and suitability. By bidding without an inspection, bidders assume the risk of potential omissions in the description. Removal Responsibilities: The successful bidder is solely responsible for all aspects of removal, including packing, crating, banding, loading, and shipping. The agency will not provide assistance. Authorized Third-Party Removal: The authorized third-party agent must present a Letter of Authorization from the high bidder (see terms and conditions for details), a copy of the purchaser's receipt, and a valid photo ID at the time of removal. This item will not ship and requires local pickup only. Disclaimer The condition of the property is not warranted. Pictures are not warranted.

Pickup Information

📍
OLDTOWN, ID 83822

Department of the Army — Department of the Army

📅Pickup within 15 business days
📝Inspections are by appointment only with 24 hours advanced notice. Recipient is responsible for all shipping and handling costs. This includes proper tools, personnel, and material required for disassembly/removal.